Appendices
Appendix for Preface: Joint Legislative Committee Report
Appendices for Chapter 5: Bituminous Mine Sites
5.A Pre-Permitting Testing Requirements
5.B Water Monitoring Results for the Revloc Sites
Appendices for Chapter 8: The Knickerbocker Site
8.A Semi-annual characterization of the proctor densities of the ash and size distributions
8.B Blow count data normalized to cell 4
8.C Semi-annual fly ash analyses and leach data
8.D Chemical analyses of ash and water samples collected February 2000 (MRL)
8.E PHREEQC thermodynamic equilibrium results from water analyses in the test cells
Appendices for Chaper 9: The Big Gorilla Site
9.A Air Photographs of Big Gorilla Site